Nail the drip edge to the roof sheathing at roughly 18 24 spacing intervals using roofing nails.
Roof drip rail installation.
Make sure the outer edge extends over the gutter.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Overlap pieces at least a couple of inches shingle style with pieces higher up on the roof overlapping pieces lower.
When lapping the eave metal overlap them so the seam faces away from the direction of prevailing view.
If it doesn t pull the drip edge out slightly from under the shingles.
Raise the shingles and push the top rim of your drip edge beneath them.
Item 15551 model 5610400120.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
The best way is to install the roof drip edge only along the eaves first then place ice and water barrier in the snowbelt or felt paper underlayment over the drip edge.
Tip 2 is.
Points to the installation of ice and water shield along the lower roof eaves protecting against ice dam leaks that are common on un vented roofs in cold weather or snow climates.
Install roof drip edge along the eaves add underlayment then place drip edge along the gable end.
How to install a drip edge.
Begin installation it is best to install a drip edge on a day with warm weather because it makes it easier for the shingles to be stripped back.
Three tips for overlapping drip edge flashing.
Secure the drip edge with roofing cement.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Amerimax c3s 1 5 in x 10 ft unpainted galvanized galvanized steel drip edge.
How to install drip edge flashing to a new roof.