Eight foot 1 2 inch thick plywood is standard sheathing material.
Roof sheet fixing.
The general advice for fixing is 4 5 screws across the sheets purlin we advise using 1 screw on the overlap of the next sheet.
Corrugated roofing sheets should be installed into the corrugated sheets crown using a 65mm tek screw with baz washer.
We recommend the use of our self drilling tek screws with 5 16 hexagon heads and 19mm sealing washers for fixing your roof.
You ll will find everything from nail fixings to glazing bars jointing strips and edging strips.
Measure the opening of the section of roof to be shingled cut the plywood to size and nail to roof rafters.
Up signs indicate the direction of the ridge to lay the sheets correctly.
After cleaning the debris and reframing the roof lay down a base sheathing.
What was previously a valley in the corrugations will now be a ridge and the nail hole will be in the correct place.
These should be long enough to get a secure fixing into your purlins.
Stagger the sheathing in a brick pattern for extra strength.
The main fixings are used to transfer all the loads acting on the cladding back to the supporting structure and to form a watertight seal.
The first raw of fixings at eave is located at 2 5 cm from the edge of the roof support osb or purlin.
Lay sheets in the opposite direction to the prevailing winds.
Fixing and securing sheets.
If fixing screws are left in the valleys your roof will leak in hundreds of places.
Remove roofing and turn each sheet over.
Whether it s a corrugated roof made from bitumen or a flat sheet roof made from plastic our fixings are compatible with many types of roof sheet.
Start laying sheets over the gutter with 6 cm overhang maximum.