For best weatherproofing begin installing your sheeting on the side opposite the.
Roof sheet installation.
Where do i begin.
Keep these tips in mind when roofing in hurricane areas.
Cut each rafter tail on the chalk line with a circular saw to ensure that every rafter is the same length.
During a hurricane the strength of the sheathing on the roof can greatly impact the homes ability to weather the storm.
Laying the first sheet of roofing.
Make absolutely sure the first sheet laid is properly positioned.
Pre drill holes on the ridges.
Cut the panels to the desired length.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
Remove the old roof.
Some panels have pre drilled holes.
Install the roofing screws vertically along each rib in the panel.
Measure the roof area.
Ventilate the roof according to current building codes step 3.
Roofing installation guide orient sheets before lifting.
How to install roof sheathing 1.
If yours do not then you will need to drill holes.
Most panels come up to 32 feet 9 8 m in length.
Be sure the larger edge is laid so that the small edge of the next panel will overlap it.
You ll want to order metal panels that are an appropriate color and look to complement your.
Position your next sheets.
You will need to order enough metal material to cover the entire roof and this process.
Installing corrugated roofing 1.
Step 3 installing liberty self adhered cap sheet.
Prime the face on the roof and allow to dry before installing cap sheet.
Measure from the peak of the roof along each rafter on one side of the roof to determine the exact length of each.
Space the screws about 12 in 30 cm apart down the entire piece of metal.
Learn about the liberty sbs self adhering base ply sheet.
Place the first screw.
Use your neoprene washer head screws to secure the metal to the sheathing.
Take care the first piece is aligned precisely perpendicular square to the edge.
This video shows how some roofs fail under heavy winds in uplift situations.
Install edge flashing over the base sheet in a 1 8 bed of cement and stagger nail with two rows of roofing nails 3 o c.
Position the first piece of plywood.
Allow for a minimum of 18.
The connection between the roof sheathing and the structure is a vulnerable point that is known to fail during a hurricane.
Align cap sheet 1 4 from the edge at the lowest point of the roof.
Check the nailing surface is level step 2.
Liberty sbs self adhering roofing system will provide long lasting protection for the low slope areas of your property without the danger or hassles associated with the installation of other conventional roofing products.
And scroll down to see more details on each with installation hints and tips below.