Permaspan roof to wall detail drawing dwg 1 06 mb permaspan roof to wall detail drawing dxf 243 6 kb permaspan roof to wall detail drawing pdf 39 38 kb.
Roof wall plate detail.
To fix the joists and rafters down on to the wall plates they should be toe or skew nailed to the top plate like below.
Dbl2x4 top plate 2x4 studs 16 oc engineered roof trusses wi overhang level return roof apron gutter.
Exterior wall parapet rafters prep.
Heat welded walkway installation.
W taped joints veneer ties.
End bearing in hanger on a top plate.
End bearing in hanger supported by i joist s 44kb.
Wall plates should be joined using half lapped joints at corners and in running lengths.
However anchor bolt spacing must be reduced 24 in.
Roof detail pitched roof to high wall 01 030 0751.
Wall plates should generally be in lengths of not less than 3m but shorter lengths should extend over at least 3 joists rafters or trusses.
Roof area divider curb type.
Lightning protection terminal roof mount detail.
Wall base termination detail.
100 dan road canton ma 02021 phone 1 800 451 2504 sales 1 800 576 2358.
Intermediate bearing with blocking panels.
Flashing conc.
Commercial roofing specs and details find the resources you need to design the best roofing system for your project.
End bearing in hanger supported by a beam.
Paraguard expansion joint roof to wall with parasolo flashing.
End bearing with blocking panels.
End bearing with rim joist.
Wall flashing with coated metal edge.
Wall with self terminating parapro paraflex 531 liquid flashing.
In scotland 100mm x 25mm wall plates should be used in long lengths butt jointed.
610 mm maximum because the top plate is loaded in its weak direction.
Whether you re in the design phase or on the roof we can provide the tools and support to get the project done right.
Roof detail high wall low roof 01 030 0804.
End bearing with rim board.
Bolted top plate as an alternate to the roof truss anchor a bolted top plate may be used for the roof to wall connection see figure 5.